Header Ad Module

Collapse

Announcement

Collapse
No announcement yet.

Change of Use application - SH to SR in Auckland

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Change of Use application - SH to SR in Auckland

    We have a property in a Mixed Housing Suburban Zone which has a separated lower level that has everything it needs to function a second dwelling. All work is consented, it simply doesn't have an oven. It is currently shown on the building plans as a lounge (with a sink in the lounge) and a bathroom.

    What do we need to provide to the council to lodge a Change of Use from SH to SR, and ensure they are happy with everything for the "new" dwelling?: fire rating, etc

    Do we need to get someone in to do a Fire Rating assessment?

    Thanks

  • #2
    fire rating is the place to start

    if you want a good sound designer try Bill Pannel WAG Ltd 021 636 38

    there is a possibility that it already has fire separation and/or was approved before this requirement and you already have SR?

    Comment


    • #3
      021 636 382

      Comment

      Working...
      X