Hi all
I've almost reached the end of a relocated house project, and have the Final Residential Inspection left. As I've self managed this, I really don't know what I need to do to pass the final hurdle. All other inspection, like bracing, drainage etc has been approved.
This is the description:
To check that all construction associated with the building consent
has been completed; this includes painting and decorating; floor
coverings; fixtures; fittings; electrical work; heating appliances; etc
My consent was not specific on the painting, floor coverings, heating etc. So my question is, to what standard does the internal and external house need to be in? Does it need to be fully repainted inside and out? Does a stove need to be installed and a heat source?
Power is running and so is water, driveways and fencing complete.
Just need some guidance as to what exactly is required.
Thanks in advance.
I've almost reached the end of a relocated house project, and have the Final Residential Inspection left. As I've self managed this, I really don't know what I need to do to pass the final hurdle. All other inspection, like bracing, drainage etc has been approved.
This is the description:
To check that all construction associated with the building consent
has been completed; this includes painting and decorating; floor
coverings; fixtures; fittings; electrical work; heating appliances; etc
My consent was not specific on the painting, floor coverings, heating etc. So my question is, to what standard does the internal and external house need to be in? Does it need to be fully repainted inside and out? Does a stove need to be installed and a heat source?
Power is running and so is water, driveways and fencing complete.
Just need some guidance as to what exactly is required.
Thanks in advance.