Hi,
I need to go unconditional on a section in the next 4 days, but there is a last piece of the puzzle I am finding it very hard to get a handle on.
I've got a pre-fab house quoted, but am unable to get an approx cost for earthworks and piling on my section.
- The geo-tech report says normal shallow pilings are required.
- The section is slightly sloping, so some earthwork+retaining wall will be required to create a flat building surface
- The house is a single level 4 bedroom 136 sqm house.
- Section is in Tauranga
Any advice as to approx costs I should account for this?
I need to go unconditional on a section in the next 4 days, but there is a last piece of the puzzle I am finding it very hard to get a handle on.
I've got a pre-fab house quoted, but am unable to get an approx cost for earthworks and piling on my section.
- The geo-tech report says normal shallow pilings are required.
- The section is slightly sloping, so some earthwork+retaining wall will be required to create a flat building surface
- The house is a single level 4 bedroom 136 sqm house.
- Section is in Tauranga
Any advice as to approx costs I should account for this?