Hi all,
Had a defacto relationship breakup - during the time of relationship I engaged a architect to design a 182m2/4 bedroom dwelling on the same site as the primary residence.
A resource consent was granted for this activity, however no building consent was granted. Also pertinent...
Announcement
Collapse
No announcement yet.
Search Result
Collapse
12 results in 0.0062 seconds.
Keywords
Members
Tags
-
Valuation of a resource consent for land use
Last edited by iknownothing; 04-03-2019, 02:15 PM.
-
Resource consent for DIY deck?
Kia ora
I'm hoping someone can tell me if resource consent and/or neighbour permission is required for the following DIY build:- Slightly raised deck .30cm off the ground covering entire back garden of a two storey terraced house (situated in a row of four, in an Auckland residential mixed housing
-
Whats required for a 'Final Residential Inspection'
Hi all
I've almost reached the end of a relocated house project, and have the Final Residential Inspection left. As I've self managed this, I really don't know what I need to do to pass the final hurdle. All other inspection, like bracing, drainage etc has been approved.
This...
-
Building Consent and Resource Consent...in what order?
Hi
I am looking at doing a knock down and rebuild of my IP just outside Christchurch.
Because it is close to the Waimak Stopbank I will need to get Resource Consent.
But I will also need to get the standard Building Consent.
But which order do you apply?
I am thinking Resource...
-
Resource Consent Consultant - North Shore
Hi
I am looking for a resource consent consultant to complete an application to build an additional dwelling. Please kindly suggest.
Thank you.
-
$4500 for drawing up plans for a small bathroom in existing laundry?? Ouch!
That is what i have been quoted from a local draughtsman.
$4500 to draw up a bathroom plan whereby i have provided the to-scale drawing, detail and measurements already .
Most of the expense he tells me is the council requirement for him to re-draw the entire house plans showing...
-
What is the value of a resource consent?
Hi all,
True Freshie, first post!
I have 2 townhouses on the North Shore that I am thinking of selling in about 6-8 months time (knock off large % of those damned mortgages). I can just sell as-is, but from discussions with a couple of architects and planners know that the...
-
Sleep out costs
Hi, does anyone have any experience in building a sleepout and the associated costs of building in Auckland?
I am looking at building a 33 sqm sleepout (5.5x6m2). Concrete foundation with a shower and a toilet.
I am not converting a garage, it will be starting from a grass base....
-
Putting stream underground
Hi all
I'm in a process of purchasing a property in Mangere, Auckland that's got a stream running over the back of the property. It goes underground on this property boundary as well as on the other side over the neighbour's boundary, but it's exposed for some reason over these two properties....
-
How long does engineering approval take? Auckland Council
Trying to get drainlaying underway .. however still waiting to hear back from council for engineering approval (we already have resource consent).
From what I can see online, they get 20 working days.. however I'd be interested to know if they generally take this long or typically get it...
-
Auckland Council - Resource Consent 'processing fees'
Hi,
There is now a deposit of $2,500 for resource consent applications in Auckland (used to be $1,500 less than 2 months ago).
We're at the tail end of our subdivision process and I'd like to know *generally* how much council processing fees are for resource consent applications....
-
Residential subdivision using an existing ROW.
Hey All.
I am looking at subdividing an existing lot which is serviced by a Private ROW.
Easement is for all services & vehicle.
Provided my development proposal is in accordance with Council's standards - Do you think I will need to get permission from other...